Scheduled maintenance of truck cranes: regulations and timing
Scheduled maintenance according to the manufacturer's timetable - is the most effective way to keep the crane in working condition and avoid emergency stops in the middle of the installation season.
For Liebherr and Grove, the first level of maintenance is scheduled every 500 engine hours: changing the engine oil and filters, checking the hydraulic fluid, lubricating the boom hinges and outriggers.
Every 2,000 engine hours, comprehensive maintenance is performed, including checking the braking system, the condition of the load-bearing winch rope, and calibrating the control system.
ILIEV Solutions creates a schedule for a specific machine, provides the necessary consumables, and coordinates the execution of maintenance in the window between projects so that the crane does not stop the contractor's work.